Search
Research and Reports
A database of documents and reports released by industry bodies. You can download the document by clicking on its title, and can filter reports by author or subject. If you have a report you would like to submit to the Rail Hub, please email [email protected].
-
ORR’s annual report on HS1 Ltd 2013-14
09/07/2014Office of Rail and Road (ORR) SearchResearchItemsThe Office of Rail Regulation’s yearly report on the performance of HS1.
-
Network Rail Monitor: Quarter 4 of Year 5 of CP4
04/07/2014Network Rail SearchResearchItemsA monitor of Network Rail’s performance during 2013-14.
-
Network Rail Monitor: Scotland – Quarter 4 of Year 5 of CP4
04/07/2014Network Rail SearchResearchItemsA monitor of Network Rail’s performance in Scotland during 2013-14.
-
West of Exeter Resilience Study
01/07/2014Network Rail SearchResearchItemsThe various options for building resilience into the South West railway including new-build and alternative routes around Dawlish.
-
Delivering a better railway for a better Britain: our plans for 2014-2019
01/07/2014Network Rail SearchResearchItemsNetwork Rail Chief Executive Mark Carne sets out ten challenges facing the railway and address how NR will tackle them.
-
Crossrail business case Summary report
01/07/2014Transport for London SearchResearchItemsAn update into the business case for the Crossrail project ahead of the construction of the tunnels.
-
Abellio Greater Anglia annual report to customers 2013-14
30/06/2014Transport Focus SearchResearchItemsPerformance figures for Abellio Greater Anglia during 2013-14.
-
Caledonian Sleeper Franchise Full Business Case
20/06/2014Transport Scotland SearchResearchItemsRedacted version of the business case for the Caledonian Sleeper franchise. Commercially confidential information redacted.
-
National Rail Passenger Survey
19/06/2014Transport Focus SearchResearchItemsResearch shows how today’s passenger operators performed, what passengers like and where TOCs must improve. Satisfaction was broadly similar to Spring 2013.
-
ERA Work Program 2014
11/06/2014European Railway Agency SearchResearchItemsA summary of the European Railway Agency’s plans for 2014.
-
Northern Rail and TransPennine Express re-franchising
01/06/2014Campaign for Better Transport SearchResearchItemsA summary of what is happening to railways in the north of England, highlighting concerns that the North won't receive the better trains and services it needs.
-
Guidelines for development management for stations
01/06/2014ATOC SearchResearchItemsStations need to target the correct market, be it regular commuters, or more leisure travellers, and facilities must reflect this when being planned.
-
Running a Better Railway
01/06/2014Rail Delivery Group SearchResearchItemsBased on studies, ‘time on tools’ during network possessions is currently estimated in many cases to be lower than the European average of 80%. This means that planned works are sometimes not completed and more access is needed. There is also increased risk of overrun and disruption for rail users.
-
Railway Safety Performance in the European Union 2014
22/05/2014European Railway Agency SearchResearchItemsThe fourth biennial report on the development of railway safety performance.
-
The Agenda for more Freight by Rail
07/05/2014Freight Transport Association SearchResearchItemsProposals to increase freight on the railway and its performance.
-
Thameslink, Southern and Great Northern Franchise Train Service Requirements
01/05/2014Department for Transport SearchResearchItemsA detailed explanation of the planned service requirement for the TSGN mega-franchise.
-
GB rail industry financial information 2012-13
17/04/2014Office of Rail and Road (ORR) SearchResearchItemsAnalysis of the GB rail industry financial information for year 2012-13.
-
Business Plan 2014/15-2017
10/04/2014Transport for Greater Manchester SearchResearchItemsOver 80% of local and regional trains in the north run through Greater Manchester, West Yorkshire and South Yorkshire. TfGM proposes that it joins forces with Metro and SYPTE and other Local Transport Authorities to become the core members of a new regional rail franchising body.
-
Network Rail’s Delivery Plan for Control Period 5
31/03/2014Network Rail SearchResearchItemsAnnual report for CP5 setting out delivery plans from April 2014 to March 2019.
-
Capturing the Value of High Speed Rail 2014
05/03/2014Independent Transport Commission SearchResearchItemsA report by the Independent Transport Commission on learning from Europe about High Speed Rail.
-
Groupe Eurotunnel Annual Review and Corporate Social Responsibility Report 2013
01/03/2014Eurotunnel SearchResearchItemsAnnual report and corporate social responsibility report for Eurotunnel Group
-
UK Freight Planning to 2035
10/02/2014The Chartered Institute of Logistics and Transport SearchResearchItemsIn order to regenerate growth and meet carbon reduction goals, we need to think radically about freight and logistics. Investment is needed in infrastructure.
-
Going Local Lessons for rail policy from London Overground and Merseyrail
06/02/2014Campaign for Better Transport SearchResearchItemsCBT investigates how locally-managed concessions perform, and what that can teach the national network.
-
Long Term Passenger Rolling Stock Strategy for the Rail Industry
01/02/2014Rail Delivery Group SearchResearchItemsA look at the long-term passenger rolling stock requirements for the rail industry
-
Long Term Passenger Rolling Stock Strategy for the Rail Industry
01/02/2014ATOC SearchResearchItemsWith the assumptions and scenarios modelled the total size of the national fleet could grow by between 53% and 99% over 30 years, while the proportion of electric (and bi-mode) vehicles could rise from 69% today to more than 90% over the same period. The consequence of the modelled scenarios is that between 13,000 and 19,000 new electric vehicles would be required over the next 30 years, taking account of growth, electrification, replacement by 2043 of most BR-procured vehicles, and HS2. This equates to a build rate of between 8 and 12 electric vehicles per week and may be compared with an average build rate of just four (diesel and electric) vehicles per week in CP4.