Network - Page 243
-
Network
Timetable set for next Manchester Metrolink contract
Transport for Greater Manchester (TfGM) has shortlisted four bidders to operate and maintain the Manchester Metrolink system.
-
Network
RDG urges ORR to collaborate on access charges
RDG calls on ORR to work with the industry on track access charges, ahead of the ORR’s Periodic Review of Network Rail’s charges that begins later this year.
-
Network
Unions strike over Night Tube again
Unions are set to strike on London Underground over the proposed introduction of the Night Tube, pay and job cuts.
-
Network
Rail fares “divorced from reality”, claims Railfuture
Rail campaign group Railfuture has attacked January’s rise in rail fares, blaming the Government for above-inflation rises.
-
Network
High speed handbacks
New advanced engineering techniques enabled trains to run at higher speeds following Network Rail’s £150 million Christmas engineering programme.
-
Network
Cooklin’s career takes new route
Susan Cooklin has switched roles to become Network Rail’s new route services director.
-
Network
Sunday closures at Victoria for latest upgrade works
Manchester Victoria station will close on Sundays from January 24 to April 17, as Network Rail’s £1 billion-plus investment in the north of England continues.
-
Network
Goodwin primed for top TPE role
FirstGroup has appointed Leo Goodwin as Managing Director Designate for the new TransPennine Express franchise that starts on April 1.
-
Network
CRP introduced on Hereward Line
The Ely to Peterborough line has been designated a Community Rail Service.
-
Network
Worn bogie liners caused Washwood Heath derailment
Worn bogie centre pivot liners and severe track twist were primary causes of a freight train derailment at Washwood Heath on March 23 2015, says RAIB.