HS2 - Page 2
-
HS2
Ballasted and non-ballasted track
As more experience of ballasted and non-ballasted track systems accumulates, Pandrol explains the pros and cons of each type
-
HS2
RAIL Investigates…Is HS2 fight a waste of taxpayers' money?
Are local authorities blowing public money on HS2? PAUL PRENTICE investigates
-
HS2
Tunnelling to the future
Much opposition to HS2 centres on environmental concerns. BEN JONES discovers how a new railway is built in Europe.
-
HS2
HS2 VIPs…very important passengers
HS2 Chief Engineer ANDREW MCNAUGHTON talks to PHILIP HAIGH about the next challenge facing builders of Britain’s high-speed line from London to the Midlands
-
HS2
HS2: "a great national cause"
ANDREW ADONIS talks exclusively to Nigel Harris about High Speed 2 and the future of Britains's railways
-
HS2
Now we need HS2, HS3…and HS4?
Jim Steer of the campaign group Greengauge 21 detects a growing recognition of the logic behind calls for a successor line to High Speed 1