Articles by RAIL magazine - Page 54
-
Network
RAIB recommends new process for overrun risk after near-miss
Only ten seconds and a good dose of luck prevented a 70mph head-on crash between a Loram rail-grinding machine and a nine-car Class 222 Meridian
-
Network
More ticket gates head £30m Victoria refresh
Twenty-five extra ticket gates are to be installed at London Victoria station, to ease its acute congestion at peak times.
-
Network
Dorothy makes a breakthrough
The 2,000-tonne Dorothy, one of HS2’s ten tunnel boring machines, has made its first breakthrough after eight months underground.
-
Network
Zero-emission in use at Ealing site
Two zero-emission hydrogen fuel cell generators have replaced diesel-powered equipment at HS2’s Victoria Road construction site at Ealing, in west London.
-
Network
Business urged to support line upgrade
Businesses along the Birmingham-Shrewsbury route are being urged to complete a survey that could help decide whether new investment includes electrification.
-
Network
Help NRA to raise funds for British-Ukrainian Aid
Help NRA to raise funds for British-Ukrainian Aid
-
Network
Shapps to cut back East West Rail?
Transport Secretary Grant Shapps has cast doubt on the second and third phases of East West Rail
-
Network
Thousand days pass since RNEP
July 17 marked 1,000 days since the Rail Network Enhancements Pipeline was last published
-
Network
Kelsian Group weighs up options on Go-Ahead bid
A rival bidder in the race to buy Go-Ahead Group says it is still “assessing its options”, in the wake of an upbeat trading update by the bus and rail business
-
Network
Lords discuss concerns over Avanti West Coast
Peers in the House of Lords have been expressing their concerns about the performance of Avanti West Coast (AWC) services.